Posted by: Aamir Hayat
Post Date: March 12, 2024
OTSU resumes production of IV Solutions Manufacturing
In a notification sent to PSX on 12/03/2024, Otsuka Pakistan Limited (OTSU) announced the resumption of its production operations.
OTSUKA has resumed the production facility of IV Solutions Manufacturing after successful renovation and upgradation works. The production was halted from 08/03/2024 onwards but resumed earlier than the expected date.
The shares of OTSU were trading at Rs. 133.82 at market close today.
Leave a Reply