In a notification sent to PSX on 12/03/2024, Otsuka Pakistan Limited (OTSU) announced the resumption of its production operations.
OTSUKA has resumed the production facility of IV Solutions Manufacturing after successful renovation and upgradation works. The production was halted from 08/03/2024 onwards but resumed earlier than the expected date.
The shares of OTSU were trading at Rs. 133.82 at market close today.
Shifa International (SHFA) has already rallied 150%, but there is still more upside to the…
The closure of the Hub Power Company Limited (HUBC) plant marks a significant shift in…
Fatima's 2QCY24 financial performance reflects a challenging quarter, marked by a significant decline in profitability…
Habib Metropolitan Bank Limited (HMB) recently released its second-quarter results for 2024, revealing a mixed…
In the oil and gas sector, the longevity of reserves is a critical measure of…
Cherat Cement Company Limited (CHCC) has recently released its financial results for the fourth quarter…