Categories: Material Information

OTSU resumes production of IV Solutions Manufacturing

In a notification sent to PSX on 12/03/2024, Otsuka Pakistan Limited (OTSU) announced the resumption of its production operations.

OTSUKA has resumed the production facility of IV Solutions Manufacturing after successful renovation and upgradation works. The production was halted from 08/03/2024 onwards but resumed earlier than the expected date.

The shares of OTSU were trading at Rs. 133.82 at market close today.

Aamir Hayat

Recent Posts

AGP Healthcare for a Better Tomorrow

AGP Limited (AGP) monthly market structure is showing strong bullish trend. Even this stock broke…

15 hours ago

Why dividends cause share price drop if they’re paid from earnings?

When a dividend is paid, the share price drops by approximately the same amount because…

2 weeks ago

MUGHAL right shares – 3 things to know before subscribing

On November 5, 2024, Mughal Iron & Steel Industries Limited (MUGHAL) announced a unique rights…

3 weeks ago

How to analyze pharmaceutical sector

How to analyze pharma sector companies in PSX. Pakistan's pharma sector is considered a complicated…

4 weeks ago

Shifa International (SHFA) has returned 150% in two months, will the rally continue?

Shifa International (SHFA) has already rallied 150%, but there is still more upside to the…

1 month ago

How is HMB handling financial challenges to grow?

Habib Metropolitan Bank Limited (HMB) recently released its second-quarter results for 2024, revealing a mixed…

3 months ago